PROJECT INTAKE

Contact Bridgelux application engineering

Frame the request with measurable lighting and integration criteria so it reaches the right technical review path.

Bridgelux global project support map

Project support desk

Address
46410 Fremont Boulevard, Fremont, California 94538, USA
Email
[email protected]
Phone
+1 510 000 2005
Hours
Monday–Friday, 08:00–17:00 Pacific Time
Professional channels
LinkedIn / Lighting specification network

Demo contact details are placeholders and must be confirmed before publication.

Two-column specification intake

Describe the operating conditions

Useful inputs include target luminous flux, CCT, CRI, beam requirement, drive current, thermal environment, controls interface, volume and project timing. Do not send confidential design files until an information-sharing process is confirmed.

What happens after submission

The intake team first checks whether the request concerns a source family, a photometric document, color data or integration support. A useful answer depends on the exact part or series, intended current and temperature condition. If the request is still at concept stage, state the required lumen package, mounting geometry and visual task rather than choosing a component prematurely.

For optical work, include target beam angle, working distance and any UGR or spill-light limit. For color-sensitive retail or hospitality applications, identify CCT, minimum CRI and whether TM-30 or spectral power distribution is part of the approval record. For industrial duty, add ambient temperature, expected operating hours and the heat-sink or enclosure approach.

Verification expectations

Application guidance supports selection; it is not a finished-luminaire certification. Prototype the selected source with its optic, driver and thermal path, then measure after stabilization. When requesting simulation files, identify the calculation software and confirm that the file corresponds to the tested configuration. Field results can differ because of installation tolerances, surface reflectance, supply conditions and aiming.

Response timing depends on document availability and technical scope. Certification marks must be confirmed against the specific product and geography. The demo address, email and telephone shown on this draft are placeholders; replace them with verified corporate contact data before launch.